WICKLOW RETROFIT & RENOVATION

RETROFIT WORKS:Attic insulation, New heating system, Air-to-water heat pump, Triple aluclad glazed windows, Airtightness, Re-wiring, Additional electrical points, LED lights
RENOVATION WORKS:Layout changes, Garage conversion, New kitchen and utility room, Stone worktops, Appliances, WC fitout, Boot room fitout, Office, Timber floors, Tiled floors, Internal doors, Skirtings and architraves, Wall panelling, Electric fires, Porch and bay window redesign, Gutters and downpipes, Light fittings, Painting
STAGES 1 – 5:12 months (COVID)
STAGE 6: CONSTRUCTION19 weeks

Right from the outset we were blown away by the professionalism of the Renova Team. John walked us through the process, step by step, and worked out a clear and transparent pricing schedule. There was no ‘hard sell’; a genuine ‘what’s best for the customer’ ethos pervades this firm. After signing up we were introduced to Sian and Barbara from the design team who met us in our house, hosted various Zoom calls and facilitated a number of design workshops onsite in the Renova premises. Both provided insightful ideas and steered us through the entire design process. Where any issues, doubts or queries arose they were straight on it, putting us quickly at ease.

The renovation process itself was wholly professional. Led by Paul and the Renova team, everything was completed in a calm and controlled manner. All we had to do was hand over the keys. We found the team to be extremely responsive to any queries we had, always willing to listen and offer advice. They were also quick to pivot when suggested changes arose, barely breaking stride. Our neighbours also commented on how unobtrusive the team were. The site was kept clean, with noise kept to a minimum where possible, and they were always mindful of not taking up too many parking spots in our cul de sac.

All in all, a relatively seamless process. We’re delighted with the results!

Project details

This renovation was carried out for friends of RENOVA, so it needed to go well.

On this job our clients priority was layout changes with cosmetic improvements, but they did want to take the opportunity to make improvements to the buildings comfort levels and efficiency where possible while doing the works. So, to improve comfort levels and energy efficiency we installed new windows with airtight tapes and a new heating system with an air-to-water heat pump. We also reinsulated the attic.

Layout changes have provided an open play kitchen/dining/living area, an improved utility layout, a home office and a better TV room. The front elevation of the house was smartened up by redesigning the entrance canopy, a new entrance threshold, and a redesigned bay window.

All new fittings, fixtures and full decoration make this house like a new home.

Budget and programme went to plan – client happy, friendship with RERNOVA still intact. Successful outcome.