Raheny Deep Retrofit Project
RETROFIT WORKS: | Attic insulation, Dry lining external walls, Insulate ground floor, Windows and external doors, Airtightness, Ventilation, Heating system, Heating controls, Re-wiring, Low energy lighting, Power and data. |
FITTINGS & FINISHES: | Kitchen, Utility, Bathrooms, Wardrobes, Fireplace, Timber flooring, Painting and decorating, Light fittings. |
STAGES 1 – 5: (incl Planning Application) | 10 months |
STAGE 6: CONSTRUCTION | 22 weeks |
Project Details
Our clients on this project had just bought this house and it needed complete modernisation and redesign to make it into a modern home. This was definitely a ‘one of everything’ job. The retrofit specification was comprehensive including a heat pump with underfloor heating. Sian & Barbara took care of the aesthetic side of things which included a substantial first floor dormer extension to the rear. This required planning permission which we submitted for our clients. The only hitch on this job was COVID which shut the site down for 3 months shortly after we stated. Other than this the project went smoothly and our clients were very pleased with their new home which is the equivalent of a brand new house. A very pleasant bonus for clients and us alike was that the finished house got an A3 BER rating, that was nice.