Glenageary Deep Retrofit Project
RETROFIT WORKS: | Drylining, Air tightness, Ventilation, Heating system, Heating controls, Plumbing, Re-wiring, Triple glazed windows and doors |
FITTINGS & FINISHES: | Layout changes, Kitchen, Worktops, Pantry, Utility room, Bathroom fitout, Wardrobes, Timber floors, Tiled Floors, Internal doors, Skirtings & architraves, Paint and decorate |
STAGES 1-5: | 11 months |
STAGE 6: CONSTRUCTION | 20 weeks |
Project Details
We had a long relationship with our clients on this project before we ever got to site. We had advised them on the purchase of properties over a couple of years prior to them buying this house in 2019, and then agreeing a renovation with us in early 2021. So, we knew each other well by the time we stared work in late 2021. The works carried out at this house stopped short of an entire gutting and renovation, the first floor attic conversion was left out of the works for this phase as it was in reasonable condition when compared to the ground floor. The house had been very cold prior to the works and is not comfortable with low energy needs. The layout was altered significantly at the kitchen in particular to provide a modern kitchen/diner plus space which now opens out to the back garden. A large pantry and utility room were added. The job went well and clients were happy at handover, we may even return in the future to work on the attic rooms.