CHURCHTOWN DEEP RETROFIT PROJECT

RETROFIT WORKS:Roof insulation, wall insulation, insulated floor slab, airtightness, ventilation, rewiring, low energy lighting, heat pump, underfloor heating, heating controls, zoned heating, plumbing, triple glazed windows.
RENOVATION WORKS:Kitchen, appliances, bathrooms, wardrobes, fireplaces, timber flooring, interior doors, skirtings & architraves, new ceilings, painting and decorating
DESIGN & PLANNING:12 weeks
CONSTRUCTION:26 weeks

PROJECT DETAILS

Brief

Our client on this job was moving back into the family home they had grown up in, with his family. The house was in ‘original’ condition and needed to be modernised. Our brief was to bring the building fabric and services up to modern standards and to extend and reconfigure for a modern layout.

Specification

This house received a complete suite of retrofit works including an air to water heat pump with underfloor heating. It was fully rewired with new low energy lighting installed. The walls, roof and floors were insulated and a full suite of airtightness measures carried out. Ventilation was installed to building standards.

In addition to retrofit works we carried out a complete refit to include all new fittings and fixtures and a complete suite of finishes and decoration.

Completed house:

The finished house has an A3 BER rating. The accommodation suits our clients requirements perfectly and the finishes and fittings are exactly to their tastes. The house is exactly as they wanted and better.