Clonskeagh Deep Retrofit Project
RETROFIT WORKS: | New insulated concrete floor slab, Drylining external walls, Roof insulation, Airtightness, Triple glazed windows, Aereco ventilation, Air-to-water heat pump, Underfloor heating, Digital heating controls, Electrical re-wire, Low energy lighting, Electric fires, Plumbing |
FITTING AND FINISHES: | Layout changes, Kitchen, Utility, Appliances, Bathroom fitouts, Wardrobes, Joinery, Stairs and balustrade, Internal doors, Skirting boards and architraves, Timber floors, Tiled floors, Carpet, Eaves and gutters, Painting and decorating. |
STAGES 1-5: | 5 months |
STAGE 6: CONSTRUCTION | 31 weeks |
Project details
Our clients on this job had just gone sale agreed when they contacted us. While waiting for the sale to close we arranged an initial viewing and a budget estimate. The renovation budget was agreed before sale closed and as soon the sale was closed we arranged our Stage 2: Design proposal.
Our clients had a very clear brief which was complete modernisation for energy efficiency plus layout changes to modernise the layout.
The design stage was swift meaning that we wasted no time getting on site. The time from first contact to beginning works on site was less than 5months.
Work on site took 31 weeks to complete. This substantial renovation was handed over a little over 1 year from our first engagement with the clients.
The completed house is A-rated BER