Thank you for your enquiry

To make the most of a house call, please complete the Check List below and submit it to us.

Feel free to enter as much content as you like, the more information we have the better. If you require works that are not listed below please mention that under ‘Additional Information’ at the foot of the check list.

If you need any assistance completing this checklist, feel free to call the office on 01 2021122 or email info@renova.ie

We look forward to hearing from you.


RETROFIT WORKS:

 

1. Attic Insulation:

YesNoMaybe

2. Insulate Ground Floor:

YesNoMaybe

3. Insulate External Walls:

YesNoMaybe

4. Sound-proofing to Party wall:

YesNoMaybe

5. Windows and external doors:

YesNoMaybe

6. Roof windows:

YesNoMaybe

7. Airtightness - eliminate draughts:

YesNoMaybe

8. Ventilation:

YesNoMaybe

9. New boiler / Heat pump:

YesNoMaybe

10. Separate Heating zones:

YesNoMaybe

11. New Heating pipework:

YesNoMaybe

12. New Radiators / Underfloor heating:

YesNoMaybe

13. Upgrade plumbing:

YesNoMaybe

14. Solar Panels:

YesNoMaybe

15. Re-wiring:

YesNoMaybe

16. Additional sockets / data points etc:

YesNoMaybe

17. Additional lighting:

YesNoMaybe

18. New Distribution board (fuse board):

YesNoMaybe

19. Structural repairs / re-roofing:

YesNoMaybe


FITOUT AND FINISHES:

 

20. Layout Changes:

YesNoMaybe

21. New Ceilings:

YesNoMaybe

22. Sound-proofing between floors:

YesNoMaybe

23. Plaster covings:

YesNoMaybe

24. Re-slab and plaster stud partitions:

YesNoMaybe

25. Sound-proofing within partitions:

YesNoMaybe

26. Bathroom fit-out:

YesNoMaybe

27. En-suite fit-out:

YesNoMaybe

28. WC fit-out:

YesNoMaybe

29. Internal doors:

YesNoMaybe

30. Skirting boards:

YesNoMaybe

31. New Stairs:

YesNoMaybe

32. Replacement Stairs handrail:

YesNoMaybe

33. Kitchen Units (with standard tops):

YesNoMaybe

34. Upgrade to Stone worktops:

YesNoMaybe

35. Utility room:

YesNoMaybe

36. New Kitchen appliances:

YesNoMaybe

37. Built-in wardrobes:

YesNoMaybe

38. Other storage / shelving requirements:

YesNoMaybe

39. Folding Attic ladder:

YesNoMaybe

40. Attic flooring (for storage):

YesNoMaybe

41. New Fireplace:

YesNoMaybe

42. Stove:

YesNoMaybe

43. Timber flooring:

YesNoMaybe

44. Carpets:

YesNoMaybe

45. Painting internally:

YesNoMaybe

46. Painting externally:

YesNoMaybe

47. Window blinds:

YesNoMaybe

48. Security alarm:

YesNoMaybe

49. Eaves, gutters and downpipes:

YesNoMaybe

50. Site drainage / sewers:

YesNoMaybe

51. Driveway:

YesNoMaybe

52. Patio:

YesNoMaybe

53. Gardens:

YesNoMaybe

54. Boundaries:

YesNoMaybe


ADDITIONAL ITEMS: